Swindon Link Centre

The Swindon Link Ice Rink flood damage refurbishment project presents a compelling case study showcasing effective project management, coordination, and timely execution under challenging circumstances.

The flash flooding incident in September 2023 inflicted significant damage to the Swindon Link Ice Rink, necessitating immediate closure. The urgency of the situation demanded swift action to restore operations.

 

Contractor Selection

JRG Productions was chosen to handle the design, quotation, supply, and installation of a new A.V. system. This selection likely stemmed from their specific expertise of ice facilities, track record, and ability to deliver under tight timelines.

Delivery

Despite the odds, the project team managed to complete the refurbishment and reopen the ice rink on time. This achievement underscores their dedication, efficiency, and ability to overcome challenges.

Key Points:

Scheduling

With the imperative to reopen before Christmas, the project faced a stringent timeline. Close coordination with all contractors involved, particularly those responsible for the ice build, was crucial to meet this deadline.

Support

Standby engineers being onsite for the first ice hockey game indicates proactive measures to ensure a smooth transition to resumed operations. Their presence likely provided reassurance and immediate support in case of any technical glitches.

Coordination

The success of the project hinged on seamless collaboration among all stakeholders. Coordination efforts likely involved regular communication, scheduling, and problem-solving to address any issues that arose during the refurbishment process.

Longevity

Regardless of the flood risk, IP rated equipment in venues that are susceptible to moisture and damp conditions such as ice rinks, mitigate against damage and in this case, would have prevented the lighting system from requiring replacement at significant cost.

Equipment Supplied:

4 x Void Acoustics Venu 15 v2

4 Void Acoustics Venu 12 v2

2 x Void Acoustics Stasys 218

2 x Void Acoustics Bias Q2

60 x Cameo Flat Pro 12 G2

12 x ADJ Titanbeam T3

1 x Das Light 5

1 x Das Light DVC Gold

2 x Zero 88 Rig Switch

1 x LD Systems 423 Mixer

1 x Cloud MX141M

3 x HP 3000 Stage Fogger